Announcements, releases and milestones from across the platform.

Halton Region has appointed GHD for clarifier, digester and sludge pump work at the Skyway Wastewater Treatment Plant, with SCADA integration and commissioning listed as deliverables rather than assumptions.

Coperion K-Tron's K-Vision-III aggregates up to 24 KCM feeder control modules, speaks Modbus TCP, EtherNet/IP and Profinet, and backs up controller parameters.

The Rosemount 105P combines transmitters, sensors, cables, flow cells and flow control into a configurable panel for pH, ORP, dissolved oxygen and chlorine, built and tested in the factory.

Commercial operations have begun at 400,000 tonnes a year, injecting into a depleted reservoir 250 km offshore and 1,800 m below the seafloor, with an ambition to reach 4-8 million tonnes.

Granite's SIM360 preloads carrier-direct profiles from all three US Tier 1 networks on a single physical SIM, with remote switching and automated failover — and no roaming in the middle.

Update A to ICSA-26-211-07 adds eight part numbers to a CC-Link IE TSN message-integrity flaw that affects every firmware version and will not be patched.

Mini-ITX, 3.5-inch SBC, COM-HPC, NUC, iBOX and an industrial IoT controller, all on Core Ultra Series 3 with up to 180 platform TOPS, In-Band ECC, and both TCC and TSN.

The nRF54LC10A pairs a 128 MHz Cortex-M33 with a 128 MHz RISC-V coprocessor, 1 MB of non-volatile memory and roughly 30 nanoamps in hibernation, in packages down to 1.93 by 2.29 mm.

MPSA-252620 describes an out-of-bounds write in the TN-4500B web login handler: no authentication needed, and the result is a dead management plane on a switch inside a train.

The QLM290P packages quad-band GNSS/RTK, a global LTE module and a LoRa radio on one pre-validated board, configurable as base station or rover over the embedded cellular link.

An ISAC trial at Vuosaari Harbour detected and tracked drones using reflections picked up by coordinated Massive MIMO base stations — no radio or emission required from the aircraft.

Putting an EtherCAT master on the front panel of a 2,070 TFLOPS inference box collapses the usual two-controller split where a Jetson thinks and a separate PLC moves.
Tell us what you're building and we'll help you scope the first deployment.